Kumtekma 300 Lt Double - Double Boiler System
Dual tank integrated system with programmable timer for uninterrupted blasting; 40-45 minutes of uninterrupted operation. A system in which two boilers are integrated together.
Category
Others
Subcategory
Surface Preparation and Surface Coating
Technical Specifications
| Capacity | 150L×2=300L total |
|---|---|
| Maximum Air Pressure | 9 bars |
| Min. Compressor Output | 12 m³ |
| Weight | 200kg |